Aircraft Projects.
The detail required for FAA approval follows the path of all true Real World design engineering requirements. Full Drawing Sets including -300 Detail Parts, -200 Assembly, & -100 Installation, as well as accompanying documentation including Engineering Orders that provide work instructions for performing all steps required to achieve an approvable project via FAA Form 8110-3. Stress & Systems Analysis including Damage Tolerance with Re-Curing Inspection Intervals and Instructions. Instructions for Continued Airworthiness, Supplementary Maintenance Manuals, Repair Manuals, and Illustrated Parts Catalogs insure future ability to show Conformity and Compliance through the STC Process and Repeatable Process Specifications to achieve approvals for PMA, Part Manufacturing Authority.
This is just a Small Example of Aircraft Projects Completed at C-DEC Consulting.
Replace Existing Stationary Bed In Master Stateroom. Boing 747-8.
With Bed that Rises 5" and Angles 5 Degrees.
To compensate for Nose Up Flight Angle.
Engineering Drawing.
Bed Design by Peter Dettmers. Mechanical Design Resource Inc.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Engineering Drawing.
Complete.
Aircraft Projects.
Client is GPS Mapping the Jungles of Ecuador. Wants to use Cessna Citation V. Mount Camera Control Computer & Mission Table.
I had access to this aircraft for 2 days. I took all the data, created the plan, built the cabinet parts and contracted out & oversaw the production of all the stainless steel parts, had all the data FAA approved, crated it up, and shipped it to Quito Ecuador where it was installed.